• About
    • Our History
    • Our Team
    • Testimonials
  • Services
    • Service & Troubleshooting
    • Planned Maintenance
    • Installation/Retrofit
    • Commercial & Residential Rebates
  • Skills
    • Heating & AC
    • Refrigeration
    • A-Gas
    • Plumbing
    • Electrical
  • Careers
  • Safety
  • News
  • Contact
    • Request Quote
    • Request Service
    • Contact Us
BC logo

Case Study : Cooling Tower Replacement Warrington PCI 755 Burrard Vancouver

Posted on September 11, 2020

Warrington PCI Management is considered the leader in regional property management in the country that manages over 8 million square feet of high profile properties across Western Canada.

The Problem.

Adam Spear contacted Peter Harteveld because the incumbent service provider was unable to provide an emergency solution for the failure of the cooling tower. The cooling tower had a catastrophic failure of the entire blower assembly. Warrington was faced with high profile retail businesses that would be unable to operate over the busy summer season Warrington PCI leaned on CustomAir to provide an instant temporary solution. They needed a large size contractor, like CustomAir, to be able to react to the problem and find a solution.

Installation of new cooling tower at 755 Burrrard Street, Vancouver.

“Warrington needed an army of the best guys in the industry to solve this problem and solve it fast.”

The Solution

Working around the clock for 4 days and flying in specialty parts from across Canada; Custom was able to get the cooling tower 75% functional…which was good enough to limp the building through the summer until a new cooling tower could be manufactured and installed on the site. This entailed daily and weekly inspections by CustomAir technicians to make sure the building was running as efficiently as possible.

The project has been completed and the building operated with optimal and efficient cooling through the summer of 2018. To learn more about this project watch the following video.

https://youtu.be/385F-V8xVyM

Next Post
Custom Air Conditioning Ltd. Announces Acquisitions of Power Plus Electric Ltd. and Certain Assets of I.C.R. Air Inc.

Recent Posts

  • CustomAir goes above and beyond February 18, 2025
  • Custom Air Conditioning Ltd. Announces Acquisitions of Power Plus Electric Ltd. and Certain Assets of I.C.R. Air Inc. December 2, 2024
  • Case Study : Cooling Tower Replacement Warrington PCI 755 Burrard Vancouver September 11, 2020
  • CustomAir Client Training Event September 11, 2020
  • Cooling Tower Use and Registration September 11, 2020

Categories

  • Heating & AC (1)
  • News (11)
HEAD OFFICE METRO VANCOUVER DIVISION
1835 Broadway St, Port Coquitlam, V3C 4Z1, BC
604.945.7728
  • Our History
  • Planned Maintenance
  • Service & Repair
  • Installation/Retrofit
  • Heating & AC
  • Refrigeration
  • A-Gas
  • Plumbing
  • Electrical
  • Careers
  • Safety
  • News
  • Request Quote
  • Request Service
Employee Portal

Technical Safety BC Licenses

Boiler Service – TSBC Licence #LBP0001097
Electrical Service – TSBC Licence #LEL0200794
Gas Service – TSBC Licence #LGA0004589
HVAC Service – TSBC Licence #LBP0046276

Copyright © 2025 All rights reserved. Web Design, Photography, SEO by Hiilite.com