• About
    • Our History
    • Our Team
    • Testimonials
  • Services
    • Service & Troubleshooting
    • Planned Maintenance
    • Installation/Retrofit
    • Commercial & Residential Rebates
  • Skills
    • Heating & AC
    • Refrigeration
    • A-Gas
    • Plumbing
    • Electrical
  • Careers
  • Safety
  • News
  • Contact
    • Request Quote
    • Request Service
    • Contact Us
BC logo

Walnut Beach Resort Case Study

Posted on September 11, 2020

 

Don Brogan General Manager of Walnut Beach Resort speaks about the troubles Walnut Beach had with their HVAC and Boiler systems. CustomAir helped resolves their issues creating a step by step plan to get them back on track.

Next Post
Custom Air Conditioning Ltd. Announces Acquisitions of Power Plus Electric Ltd. and Certain Assets of I.C.R. Air Inc.

Recent Posts

  • CustomAir goes above and beyond February 18, 2025
  • Custom Air Conditioning Ltd. Announces Acquisitions of Power Plus Electric Ltd. and Certain Assets of I.C.R. Air Inc. December 2, 2024
  • Case Study : Cooling Tower Replacement Warrington PCI 755 Burrard Vancouver September 11, 2020
  • CustomAir Client Training Event September 11, 2020
  • Cooling Tower Use and Registration September 11, 2020

Categories

  • Heating & AC (1)
  • News (11)
HEAD OFFICE METRO VANCOUVER DIVISION
1835 Broadway St, Port Coquitlam, V3C 4Z1, BC
604.945.7728
  • Our History
  • Planned Maintenance
  • Service & Repair
  • Installation/Retrofit
  • Heating & AC
  • Refrigeration
  • A-Gas
  • Plumbing
  • Electrical
  • Careers
  • Safety
  • News
  • Request Quote
  • Request Service
Employee Portal

Technical Safety BC Licenses

Boiler Service – TSBC Licence #LBP0001097
Electrical Service – TSBC Licence #LEL0200794
Gas Service – TSBC Licence #LGA0004589
HVAC Service – TSBC Licence #LBP0046276

Copyright © 2025 All rights reserved. Web Design, Photography, SEO by Hiilite.com